Since the church is a two-level facility we recognized the need for having a better way to transport between the first and second floors. After looking at various options and much prayer the membership decided to purchase a commercial grade elevator. This was a substantial commitment for the church.

The elevator was completed and dedicated on May 28, 2010. The shaft had been installed when the addition was added in 2007 and the completed elevator is now being enjoyed by those who are unable to climb the stairs between floors. It is located off the new vestibule.